The labor and site work that turn a gate and an opener into a working system. It varies most from one property to the next.

Posts
Size and depth
Pads
For slide operators
Wiring
In conduit
Setup
Limits, force, devices

What moves the number

  • Posts or columns: new steel posts set in concrete, or mounting to existing columns.
  • Concrete pads: slide operators sit on a pad.
  • Trenching: for wiring between posts, to safety devices and to the keypad.
  • Ground conditions: roots, rock, wet clay and slopes.
  • Removal: taking out and hauling off an old gate or opener.
  • Setup: programming limits, force, timers, remotes and safety devices, and showing you how it all works.

What should be on the quote

  • Everything above, either included or listed as an extra
  • Who pulls any permits
  • How long the install takes
  • Labor warranty

Watch for

“Installation” as one line with no detail. Ask what’s included. That’s where the surprises live.

Get a quoteFour quick answers. A local installer follows up. Free, no obligation.
Get a quote

What do you want quoted?Step 1 of 3

The basics

Step 2 of 3
Gate style

Pick one.

ft

Enter the width in feet.

Enter a 5-digit ZIP code.

Pick one.

Property

Pick one.

Where should the quote go?

Step 3 of 3

    Enter your name.

    Enter a valid email.

    Enter a 10-digit phone number.

    • Free to request
    • No obligation
    • Local Acadiana installers

    Questions

    How long does an install take?

    An opener on a good gate can be a day. A new gate, posts and power can take several days, plus time for concrete to cure.

    Do I need a permit?

    It depends on where you live and the work involved, especially electrical work. Ask who handles it.